REHABILITATION

Mechanical procedure

 

• air lifting

• swabing

• jetting

• brushing

 

Chemical procedure

 

Using chemical for an effect on different types of incrustation, including biomass.

First treatment using non toxic, non corrosive and naturally degradable chemicals in Croatia.

Without phosphates and copper compounds.

Investor: KRAŠ - ZAGREB

This water well is over 30 years old and it was last cleaned 15 years ago. The well was plugged with clayey muddy incrustations as well as calcium and magnesium carbonate and iron oxide incrustations. This resulted in drastic well specific capacity drop. Dynamic groundwater lever reached critical level where submersible pump couldn't work no more. Rehabilitation was successful through combined use of mechanical and chemical treatment.

SNIMANJE ZDENCA PODVODNOM KAMEROM

Investor: VODOVOD I KANALIZACIJA KARLOVAC

GAZA III water supply yard

Water wells are over 40 years old and have never been rehabilitated up to now. With nonspecific construction, they had to be rehabilitated and rebuilt to be usable until new wells were constructed.

ČIŠĆENJE I OBNAVLJANJE ZDENACA

The well was leaking sand because of the damage in the upper part of the casing. In this case, if there wasn't the worker's intervention inside the well, rebuilding as temporary solution could not be completed. Spiral screens with great open area were installed inside the old casing using the "casing in casing" system as the final solution.

Investor: MEĐIMURSKE VODE

PRELOG water supply yard

Water well rehabilitation on old wells, with 800 mm casing diameter, successfully completed through combined mechanical and chemical treatment.

REVITALIZACIJA STARIH ZDENACA I POBOLJŠANJE NJIHOVE IZDAŠNOSTI
NAKON PRIMJENE KEMIKALIJA KOD ČIŠĆENJA ZDENCA KOLIČINA VODE JE VIŠESTRUKO POVEĆANA

Investor: SARAJEVSKI KISELJAK, 2015

KISELJAK water supply yard

After rehabilitating the well through combined mechanical and chemical treatment, specific well capacity is almost the same as it was when the well was first constructed in 1983.

Investor: POMAK / HRVATSKE VODE, 2017

ŠČEĆE water supply yard - island of Vis

STARI BUNARI NAKON REVITALIZACIJE ILI OBNAVLJANJA DAJU VIŠESTRUKO VIŠE VODE

Old water well, rehabilitated using combined mechanical and chemical procedures. The well capacity was increased several times.

Activities

 

Water well drilling, testing, rehabilitation, pump installation, conceptual designs and project documentation making; professionally and inexpensive.

Expert advice

 

You need water well but don't know how to start?

We can help you with our advice or with drilling.

Telephone: 01/37 05 783, Cell: 098/28 06 56, E-mail: info@geoistrazivanje.com